DIVISION EIGHT
Hollow Metal Doors & Frames
Back to site
01 Product 02 Bid date 03 Jobsite 04 Plans 05 Contact

What are you quoting?

Select everything on the job. We quote it as one package.

08 11 13

Hollow metal doors

Flush, vision lite, louvered, labeled to 3 hours.

08 14 16

Wood doors

Field-finished architectural wood.

08 14 16

Pre-finished wood doors

Factory finish, ready to hang.

08 12 13

Frames

Welded and KD, masonry or drywall anchors.

When is the bid due?

We return the takeoff and quote in 48 hours.

No date selected

Leave yourself room. Pick a day or two ahead of the real deadline, because addenda and revisions always show up.

Where is the jobsite?

Unloading and destination set the freight quote.

Unloading

Liftgate needed

We book the gate on the truck.

Unloading

Forklift on site

You unload at the dock or curb.

This can't be your office address. The jobsite ZIP sets the tax treatment, so quotes ship to the site.

Upload the plans.

Full set, spec section, or a photo of the door schedule. We do the counting.

Drop files here or click to browse

Who gets the quote?

Contractor Preferred Pricing members get their tier applied automatically.

Members

Sign in to Contractor Preferred Pricing

Your tier, exemptions, and ship-to's are on file.

New here

I don't have an account yet

Join free on the next step. Verified once.

Join Contractor Preferred Pricing.

Free to open, verified once. Rebates, exemptions, and premium freight come standard.

Plans received.

Your counted quote and draft submittal are on the way within 48 hours. If anything in the set is unreadable, we call you once.

Bids due sooner? Call (615) 555-0142 and we'll work your deadline.